Project Management

Aspect Critical Power & Vertiv

Since 2018 we have been trusted by Aspect Critical Power and Vertiv to project manage large critical power projects throughout the UK. At HSBC in Canary Wharf we project managed a 2MW upgrade of the UPS systems. This complex project involved upgrading the existing busbar distribution system, strip out of redundant critical power infrastructure and the installation and commissioning of a new 2MW UPS system, whilst supporting the load with a temporary UPS.